Skip to main content

Asphalt Resurfacing

 

 

PROJECT ID

PROJECT LOCATION/PROJECT LIMITS

(project length)

PROJECT DESCRIPTION

RECOMMENDED FOR

FUNDING

% OF TOTAL FUNDING

ADDITIONAL NON-CITY FUNDING

( C – confirmed)

(P – pursue grants)

PROJECT ATTRIBUTES

Church Street

 

North Decatur Rd to Erskine Rd

 

(13,200 feet)

Mill/full depth reclamation and resurface; re-striping

$500,000

4.3

LMIG

 

(C)

Road experiencing significant pavement distress. Another cold/wet winter with freeze/thaw conditions will result in significantly more potholes

Pavement Condition rating using GDOT PACES system justifies road rehabilitation

             

Carroll Park Drive

Market Street to Dead end

(580 feet)

Full-depth base reclamation and resurface

$70,000

.60

LMIG

(C)

Significant pavement base failures on entire road

             

Brocket Rd

US Highway 278 EB off/on ramps to East Ponce de Leon

 

(2200 feet)

Mill and resurface; restriping

$450,000

3.8

LMIG

(C)

Road experiencing significant pavement distress. Another cold/wet winter with freeze/thaw conditions will result in significantly more potholes

Pavement Condition rating using GDOT PACES system justifies road rehabilitation

             

East Ponce de Leon

 

Market Street to Church St

 

(3600 feet)

Mill and resurface; restriping

$200,000

1.7

LMIG

 

(C)

Road experiencing significant pavement distress. Another cold/wet winter with freeze/thaw conditions will result in significantly more potholes

Pavement Condition rating using GDOT PACES system justifies road rehabilitation